- This topic is empty.
Viewing 1 post (of 1 total)
Viewing 1 post (of 1 total)
- You must be logged in to reply to this topic.
Arthur Wang Digital Blog
Home › Forums › Production Planning › Assign Material Components
If you want to assign a material component as a part-to-be- provided to an operation, you:
A. choose a control key that allows external processing
B. Set the Subcontracting indicator in the purchasing data for the operation.
—
Correct Answers
(A, B)