- This topic is empty.
Viewing 1 post (of 1 total)
Viewing 1 post (of 1 total)
- You must be logged in to reply to this topic.
Arthur Wang Digital Blog
Home › Forums › Production Planning › What is MRP
What is MRP?
Explain with real time scenario.
—
Planning the material for procurement based on the your requirement.
1. MRP – Material requirement planning.
This is based on the work order planning system generate the Indents (like sales order and demand order).
2. CBP-Consumption based planning.
This based on the settings of reorder point, stock levels and lot size settings (MRP views).
System generate the indents based on this settings in Material Master.