- This topic is empty.
Viewing 1 post (of 1 total)
Viewing 1 post (of 1 total)
- You must be logged in to reply to this topic.
Arthur Wang Digital Blog
Home › Forums › Production Planning › Configurable material/BOM
I would like to know about the configurable material/BOM.
How should I start with it?
—
Configurable materials have a bill of material that contains all components that are used in at least one variant. Likewise, the task list for the configurable material contains all operations that are used to manufacture at least one variant. By using the material configuration, only the components and operations that are required for one variant are selected.
Configurable materials are either created in a material type that allows the configuration (in the standard system, the material type KMAT) or they are given the indicator ‘Configurable’ in the material master record.