Question:
You can enter work scheduling times in one of the following ways:
A. By entering the setup time, interoperation time, and processing time for the material, as well as the base quantity to which the processing time relates.
B. By entering the entire in-house production time, this being the sum of setup time, interoperation time, and processing time.
—
Correct Answer:
(A, B)