Question:
I have a problem when trying to settle one of WBS with message
Sender: WBS OO/03-1870 Duyong Virtual Pipeline Manager
E No source assignment found for cost element 990232
Answer:
If you want to settle any amount in a WBS (a sender), the cost element needs to be included in your Source Assignment configuration in the IMG under “Settlement” via Project Systems. Also you have to have your allocation structure set up. Both these must include cost element 990232, either within a range or within a Cost element group.
If you have cost element groups already assigned in these two structures, then you only need to use Tx. KAH2 to update the relevant cost element group with this cost element (990232).