What is the meaning of planning file entry? Scope of planning fire entry is to reduce the planning run. All materials assigned with MRP are automatically entered in planning file entry. The planning file contents: 1. MPS
Depends on changes in material planning or in proposal, system will create planning file entry. When MRP run system will consider only which materials having entry in above contents of planning file entry. If the materials is created before activating planning
file for plant, you must generate planning file entry for all material
by tcode MDAB.
Planning File Entry: 1. The first process in MRP is the checking of the planning file. The planning run and the scope of the planning run (which materials are planned in which planning run) are controlled by the planning file. The planning file contains a list of all materials relevant to the planning run. As soon as a material master record is created with MRP data and a valid MRP type, this material is then automatically included in the planning file. 2. If a material was created before the planning run was activated for a plant, you must generate an entry in the planning file for all materials in this plant that are to be included in the planning run. T-Codes : MD20 - Create planning file entry MD21 - Display planning file entry MDAB - Set up planning file entry in background MDRE - Check planning file entry
Read Also:
SAP PP Reference Books:
Goto:
Back to:
Return to :-
(c) www.gotothings.com All material on this site is Copyright.
|