The following are some SAP PP Questionnaires which
you can try:
1. During material master creation if you select "ND"
in MRP type field.
a. None of the MRP dependent fields need be filled.
b. Schedule Margin Key is Must.
c. Strategy group filed is must
2. Work center can have
a. More than one cost center
b. As many formulas as cost centers
c. Only one cost center
3. Lot sizing procedure for `lot-for-lot order quantity'
a. MB
b. FX
c. EX
d. WB
4. The planning time fence specifies:
a. A period within which changes to the master plan are
made automatically
b. A period within which MRP should be run without fail
c. Is only for information purpose to the MRP controller
d. A period within which no automatic changes are to
be made to the master plan
5.Alternate unit of measure can be maintained.
a. In only basic data view
b. In MRP screen only
c. In any of the views.
6.Assembly scrap can be maintained in
a. BOM
b. Material master
c. Work center
D. Routing
7. Planned order can be converted
a. Production order /Process order
b. Run schedule Header
c. Sales order
8. Availability check in PP can consider
a. Only settled production orders
b. Only released production orders
c. Only Production orders with TECO status.
9. While creating the routing
a. By default standard sequence will be created
b. System will prompt the user whether to create parallel
or alternate sequence
c. System will create only alternate sequence.
10. If two similar materials are to be produced in the
same production line
a. a single routing can do the purpose
b. Two separate routings are must
11. Sales order is just for display Purpose & it will
not disturb PIR's in MRP Run
a. Strategy group 10
b. Strategy group 20
c. Strategy group 40
12. Settlement profile is assigned to
a, Production order Type
b. Production scheduler.
c. MRP parameters
13. Product cost collectors in REM
a.,. To be created manually with reference to Production
version
b. They will be created automatically in back ground
c. They will be by default in the system.
14. In REM Movement type used for goods receipt is
a. 131
b. 101
c. 561
15. If a material is to be used in quota arrangement,
the first prerequisite is
a. Setting in Material master
b. Creation of quota arrangement
c. Settings in MM module
16. If a material has MRP type manual reorder point &used
as a component of a product BOM.
a. In MRP run dependent requirement for this materials
will be considered for planning.
b. In MRP run dependent requirement for this materials
will not be considered for planning.
17. The planning time fence specifies:
a. A period within which changes to the master plan are
made automatically
b. A period within which MRP should be run without fail
c. Is only for information purpose to the MRP controller
d. A period within which no automatic changes are to
be made to the master plan.
18. For creation of reference operation set
a. Material code is a must
b. Material code is not required
c. A routing is must.
19. While creation of material master
a. Plant & storage location stock view will be a
default
b. You have to select plant & storage location stock
view if you want
20. Planning horizon is a setting
a. a setting in Customizing
b. a setting in Material master
c. a setting in MRP control parameters.
21, in standard SAP
a. you can confirm the production order with out making
GI for production order.
b. for confirming the production order GI is must.
22. Transaction codes relevant for Product costing
a.CO11n
b.CK11N
c.Co02
d.CK01
23. To create the production order from the planned order
Tcode is
a. CO40
b. CO 01
c. CO 02
24. Production order can be released automatically while
creation
a. by configuring Production scheduler profile &
making input in work scheduling view
b. can not be done
c. By configuring the MRP Group
25. .To have phantom assembly functionality
a. Setting in material master is required
b. Only BOM setting is required
c. Setting in both BOM & Material master required.
Answers for the above SAP PP Questionnaire:
1. During material master creation if you select "ND"
in MRP type field.
a. None of the MRP dependent fields need be filled.
2. Work center can have
c. Only one cost center
3. Lot sizing procedure for `lot-for-lot order quantity'
c. EX
4. The planning time fence specifies:
d. A period within which no automatic changes are to
be made to the master plan
5. Alternate unit of measure can be maintained.
c. In any of the views.
6. Assembly scrap can be maintained in
a. BOM
b. Material master
c. Work center
7. Planned order can be converted
a. Production order /Process order
8. Availability check in PP can consider
b. Only released production orders
9. While creating the routing
a. By default standard sequence will be created
10. If two similar materials are to be produced in the
same production line
a. a single routing can do the purpose
11. Sales order is just for display Purpose & it will
not disturb PIR's in MRP Run
a. Strategy group 10
c. Strategy group 40
12. Settlement profile is assigned to
a. Production order Type
13. Product cost collectors in REM
a. To be created manually with reference to Production
version
14. In REM Movement type used for goods receipt is
a. 131
15. If a material is to be used in quota arrangement,
the first prerequisite is
a. Setting in Material master
16. If a material has MRP type manual reorder point &used
as a component of a product BOM.
a. In MRP run dependent requirement for this materials
will be considered for planning.
17. The planning time fence specifies:
d. A period within which no automatic changes are to
be made to the master plan.
18. For creation of reference operation set
b. Material code is not required
19. While creation of material master
a. Plant & storage location stock view will be a
default
20. Planning horizon is a setting
a. a setting in Customizing
c. a setting in MRP control parameters.
21. in standard SAP
b. for confirming the production order GI is must.
22. Transaction codes relevant for Product costing
b. CK11N
23. To create the production order from the planned order
Tcode is
a. CO40
24. Production order can be released automatically while
creation
a. by configuring Production scheduler profile &
making input in work scheduling view
25. .To have phantom assembly functionality
c. Setting in both BOM & Material master required. |