Comprehensive SAP PP Questionnaire |
This article provides a detailed SAP PP Questionnaire
with answers for professionals seeking to enhance their understanding of
the SAP Production Planning module. These questions cover various aspects
of SAP PP, including Material Master, Work Center, Routing, MRP, Production
Orders, and more.
Questions1. During material master creation, if you select "ND" in the MRP type field:a. None of the MRP dependent fields need be filled. b. Schedule Margin Key is Must. c. Strategy group filed is must. 2. Work center can have:
3. Lot sizing procedure for `lot-for-lot order quantity`:
4. The planning time fence specifies:
5. Alternate unit of measure can be maintained:
6. Assembly scrap can be maintained in:
7. Planned order can be converted to:
8. Availability check in PP can consider:
9. While creating the routing:
10. If two similar materials are to be produced in the
same production line:
11. Sales order is just for display purpose & it will
not disturb PIR's in MRP Run:
12. Settlement profile is assigned to:
13. Product cost collectors in REM:
14. In REM, movement type used for goods receipt is:
15. If a material is to be used in quota arrangement,
the first prerequisite is:
16. If a material has MRP type manual reorder point &
is used as a component of a product BOM:
17. The planning time fence specifies:
Answers for SAP PP Questionnaire1. a2. c 3. c 4. d 5. c 6. a, b, c 7. a 8. b 9. a 10. a 11. a, c 12. a 13. a 14. a 15. a 16. a 17. d 18. b 19. a 20. a, c 21. b 22. b 23. a 24. a 25. c This questionnaire serves as an excellent resource for
SAP PP professionals preparing for interviews or assessments. It covers
key concepts required for effective management and operation of SAP Production
Planning.
|
![]()
|