The following are some SAP PP Questionnaires which you can try:

1. During material master creation if you select "ND" in MRP type field.
a. None of the MRP dependent fields need be filled.
b. Schedule Margin Key is Must.
c. Strategy group filed is must

2. Work center can have 
a. More than one cost center
b. As many formulas as cost centers
c. Only one cost center

3. Lot sizing procedure for `lot-for-lot order quantity'
a. MB
b. FX
c. EX
d. WB

4. The planning time fence specifies:
a. A period within which changes to the master plan are made automatically
b. A period within which MRP should be run without fail
c. Is only for information purpose to the MRP controller
d. A period within which no automatic changes are to be made to the master plan

5.Alternate unit of measure can be maintained.
a. In only basic data view
b. In MRP screen only 
c. In any of the views.

6.Assembly scrap can be maintained in
a. BOM
b. Material master
c. Work center
D. Routing

7. Planned order can be converted 
a. Production order /Process order
b. Run schedule Header
c. Sales order

8. Availability check in PP can consider 
a. Only settled production orders
b. Only released production orders
c. Only Production orders with TECO status.

9. While creating the routing 
a. By default standard sequence will be created
b. System will prompt the user whether to create parallel or alternate sequence
c. System will create only alternate sequence.

10. If two similar materials are to be produced in the same production line
a. a single routing can do the purpose
b. Two separate routings are must

11. Sales order is just for display Purpose & it will not disturb PIR's in MRP Run
a. Strategy group 10
b. Strategy group 20
c. Strategy group 40

12. Settlement profile is assigned to
a, Production order Type
b. Production scheduler.
c. MRP parameters

13. Product cost collectors in REM 
a.,. To be created manually with reference to Production version
b. They will be created automatically in back ground
c. They will be by default in the system.

14. In REM Movement type used for goods receipt is 
a. 131
b. 101
c. 561

15. If a material is to be used in quota arrangement, the first prerequisite is
a. Setting in Material master
b. Creation of quota arrangement 
c. Settings in MM module

16. If a material has MRP type manual reorder point &used as a component of a product BOM.
a. In MRP run dependent requirement for this materials will be considered for planning.
b. In MRP run dependent requirement for this materials will not be considered for planning.
 

17. The planning time fence specifies:
a. A period within which changes to the master plan are made automatically
b. A period within which MRP should be run without fail
c. Is only for information purpose to the MRP controller
d. A period within which no automatic changes are to be made to the master plan.
 

18. For creation of reference operation set 
a. Material code is a must
b. Material code is not required
c. A routing is must.

19. While creation of material master 
a. Plant & storage location stock view will be a default
b. You have to select plant & storage location stock view if you want 

20. Planning horizon is a setting 
a. a setting in Customizing
b. a setting in Material master
c. a setting in MRP control parameters.

21, in standard SAP 
a. you can confirm the production order with out making GI for production order.
b. for confirming the production order GI is must.

22. Transaction codes relevant for Product costing
a.CO11n
b.CK11N
c.Co02
d.CK01

23. To create the production order from the planned order Tcode is
a. CO40
b. CO 01
c. CO 02

24. Production order can be released automatically while creation 
a. by configuring Production scheduler profile & making input in work scheduling view
b. can not be done
c. By configuring the MRP Group

25. .To have phantom assembly functionality 
a. Setting in material master is required
b. Only BOM setting is required
c. Setting in both BOM & Material master required.
 

Answers for the above SAP PP Questionnaire:

1. During material master creation if you select "ND" in MRP type field.
a. None of the MRP dependent fields need be filled.

2. Work center can have 
c. Only one cost center

3. Lot sizing procedure for `lot-for-lot order quantity'
c. EX

4. The planning time fence specifies:
d. A period within which no automatic changes are to be made to the master plan

5. Alternate unit of measure can be maintained.
c. In any of the views.

6. Assembly scrap can be maintained in
a. BOM
b. Material master
c. Work center

7. Planned order can be converted 
a. Production order /Process order

8. Availability check in PP can consider 
b. Only released production orders

9. While creating the routing 
a. By default standard sequence will be created

10. If two similar materials are to be produced in the same production line
a. a single routing can do the purpose

11. Sales order is just for display Purpose & it will not disturb PIR's in MRP Run
a. Strategy group 10
c. Strategy group 40

12. Settlement profile is assigned to
a. Production order Type

13. Product cost collectors in REM 
a. To be created manually with reference to Production version

14. In REM Movement type used for goods receipt is 
a. 131

15. If a material is to be used in quota arrangement, the first prerequisite is
a. Setting in Material master

16. If a material has MRP type manual reorder point &used as a component of a product BOM.
a. In MRP run dependent requirement for this materials will be considered for planning.

17. The planning time fence specifies:
d. A period within which no automatic changes are to be made to the master plan.

18. For creation of reference operation set 
b. Material code is not required

19. While creation of material master 
a. Plant & storage location stock view will be a default

20. Planning horizon is a setting 
a. a setting in Customizing
c. a setting in MRP control parameters.

21. in standard SAP 
b. for confirming the production order GI is must.

22. Transaction codes relevant for Product costing
b. CK11N

23. To create the production order from the planned order Tcode is
a. CO40

24. Production order can be released automatically while creation 
a. by configuring Production scheduler profile & making input in work scheduling view

25. .To have phantom assembly functionality 
c. Setting in both BOM & Material master required.

SAP PP 

SAP MRP

Read Also:
Logs and Its Relationship with Production Orders

SAP PP Reference Books:
SAP Production Planning , Configuration, Interview Questions and Certification, Books

Goto:
SAP MRP - Materials Requirements Planning Configuration Hints and Tips 

Back to:
SAP PP (Production Planning) Configuration Hints and Tips

Return to :-
SAP ABAP/4 Programming, Basis Administration, Configuration Hints and Tips

(c) www.gotothings.com All material on this site is Copyright.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
All product names are trademarks of their respective companies.  The site www.gotothings.com is in no way affiliated with SAP AG.
Any unauthorised copying or mirroring is prohibited.