Scrap Management in Finished Product

Can anybody tell me that how I will manage scrapped finished product.
For e.g, If I already entered operational scrap and component scrap percentage at the required fields.
Let us say, planning is of 250 pcs., as we have put some percentage of  scrap so the planning is of 270 pcs.
But in actual production 255 are correct and 15 are defective.
So where I will keep the record of these defective pcs. and how I will plan for reworking of these defective items.
Also , if I want a report that during on date (x), in shift (y) how much were scrap or defective item, how I will get?
 

Why are you not using by-product and confirm the production under 531 movement. In this way you find everything against material code.

Sanjay
 

In order confiramtion screen, you can put the quantity which is ok. Rest of the qty you will have to enter in rework or scrap qty. But, alone entry in this field will give only information that how much qty is rejected or to be reworked.You will have to make an additional GR for scrapped qty,stating it in the code of scrap.  If you want to rework, then make a new rework order of the qty not confirmed in prodn order.

You can also have a trigger point, in order confirmation screen which will trigger new rework order or generation of scrap if you entered any qty in respective fields.

I think this can solve your problem.

Mahendra
 

It is not correct to put scrap % for all materials. This is to be used only in case of fix rejection which is by virtue of process e.g. molding casts, sheet metal, pipes, gaskets, lids etc.

It is better to use 531 movement if it is a single component e.g. casting by putting the scrap quantity.

Please note that if those can be reworked then you shall use quality module e.g. Final Assembly (entire final assembly never gets scrapped).  So that product will go in quality & then accept the OK quantity & reject rework.  After reworking accept those parts.   Alternately for recording rework use rework orders.

Best way to scrap material is manually post actual rejection using 551-movement separately.

Prasad Indapwar
 

You have take the help of Quality management in which you have to create lot for each production shift wise and aganinst each lot you have to record good, diffective stocks you will get total MIS.

A.Surendra Kumar

Read Also:
Control Regular Entry for Material Consumption

SAP PP Reference Books:
SAP Production Planning , Configuration, Interview Questions and Certification, Books

Goto:
SAP MRP - Materials Requirements Planning Configuration Hints and Tips 

Back to:
SAP PP (Production Planning) Configuration Hints and Tips

Return to :-
SAP ABAP/4 Programming, Basis Administration, Configuration Hints and Tips

(c) www.gotothings.com All material on this site is Copyright.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
All product names are trademarks of their respective companies.  The site www.gotothings.com is in no way affiliated with SAP AG.
Any unauthorised copying or mirroring is prohibited.