User Requirement Mapping on SAP Production

This is the list of user requirement in my company for your reference.
 
No. Business Process User Requirement
1 Production Planning System will allow issue of raw materials against multiple orders. System should also capture an expected return quantity to be considered during MRP. 
System should also allow a post facto consumption based allocation of the issued raw material against each of the production orders.
2 Production System will take into account the conversion between various units of measurement such as KGs, Length, Square meters, Units, Thousands etc and at each stage such as input and output at each work centre.
3 Production System will do auto-conversion from one user input unit of measurement into other units of measurement
4 Production System will allow capturing the output quantity and the wastage quantity at each work centre. 
5 Production System will be able to identify each material on the shop floor as WIP, using unique identification codes.
These codes should capture:
Type of Items- such as RM, WIP, Waste Item etc. 
Item - The actual material produced items like crab stick, etc. 
6 Production Semi-Finished Goods stock will be tracked using these WIP codes for quantity as well as value.
7 Production System will also have the ability to track and record the transaction the Raw materials, packing and Finished goods using bar codes.
8 Production System will also compute the idle time for each work centre based on the captured production data.
9 Production System will be able to capture and report on shop floor data consolidated on date, machine, shift, process and job. Data to be captured are input / output quantities, consumption of materials, units of measurement, start and end time of the process, idle time, setup time for each SKU, labour time, machine time etc.
10 Production System will be able to calculate the machine efficiency based on standard and actual parameters such as speed, run time etc.
11 Production As the actual consumption for materials, labour and machine hours can be different from standard consumption - system will allow for variance monitoring and analysis
12 Production Planning MIS on productivity such as total input and output of materials and reporting per work centre wise, plant wise etc.
13 Production Planning Ability to report on the cost of production for each finished and semi-finished good.
14 Production System will be able to interface with plant automation systems (Weighing M/c.)
15 Production System will able to store production job history such as cause of variance , notes 
16 Production System will be  able to support creation of alterative Bill of materials for product

SAP PP

SAP MRP

Read Also:
SAP PP Configuration Tcodes

SAP PP Reference Books:
SAP Production Planning , Configuration, Interview Questions and Certification, Books

Goto:
SAP MRP - Materials Requirements Planning Configuration Hints and Tips 

Back to:
SAP PP (Production Planning) Configuration Hints and Tips

Return to :-
SAP ABAP/4 Programming, Basis Administration, Configuration Hints and Tips

(c) www.gotothings.com All material on this site is Copyright.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
All product names are trademarks of their respective companies.  The site www.gotothings.com is in no way affiliated with SAP AG.
Any unauthorised copying or mirroring is prohibited.