What Transaction to Perform
Discontinued Parts
In industry we need to replace on part by another material. this due to the following reason: New safety regulations come into force on a certain date. Therefore, a specific component must be discontinued as it no longer complies with the safety regulations, or an expensive part is to be replaced by another cheaper part. Therefore, the aim of the 'discontinued
parts' procedure is to replace one component by another component at a
certain point in time. This means that the dependent requirements for the
current component are to be reassigned to another part (the follow-up
The material that is to be discontinued must be defined as a part to be discontinued in the material master record. Go to MM02 in MRP 4
view click on discontinued part checkbox.
A distinction is made whether;