What Transaction to Perform Discontinued Parts

In industry we need to replace on part by another material. this due to the following reason:

New safety regulations come into force on a certain date. Therefore, a specific component must be discontinued as it no longer complies with the safety regulations, or an expensive part is to be replaced by another cheaper part.

Therefore, the aim of the 'discontinued parts' procedure is to replace one component by another component at a certain point in time. This means that the dependent requirements for the current component are to be reassigned to another part (the follow-up
material), once you have exhausted the stocks of the current material.

The material that is to be discontinued must be defined as a part to be discontinued in the material master record.

Go to  MM02  in MRP 4 view click on discontinued part checkbox.
Then entre the new material and date from which the new materil is to be taken in planning.

A distinction is made whether;
a) exactly one material is to be replaced by one follow-up material (simple discontinuation), or whether
b) a group of materials are to be replaced by another group of materials (parallel discontinuation)

Amol Gaurkar

Read Also:
Control Regular Entry for Material Consumption

SAP PP Reference Books:
SAP Production Planning , Configuration, Interview Questions and Certification, Books

Goto:
SAP MRP - Materials Requirements Planning Configuration Hints and Tips 

Back to:
SAP PP (Production Planning) Configuration Hints and Tips

Return to :-
SAP ABAP/4 Programming, Basis Administration, Configuration Hints and Tips

(c) www.gotothings.com All material on this site is Copyright.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
All product names are trademarks of their respective companies.  The site www.gotothings.com is in no way affiliated with SAP AG.
Any unauthorised copying or mirroring is prohibited.