Work Center Creation and Change

Work Center (CR01 - Create, CR02 - Change, CR03 - Display)

Using the data maintained for a work center, you can

  • determine which machines or people are to be used in the operations
  • calculate costs, capacities and dates for the operations
OP42 - Configure the default value for Work Center during the initial creation.

Default Work Center

After creating many work center in the Routing, the users might want to check what materials and components allocation have been updated with this work center.  You can used this program Work Center in Routing - Search through all the routing for the material and component allocation used.

The standard program transaction CA80, checks where the work center was used in the routing.  However, it did not list the components allocation for the work center.

Pooled Capacity field - When a production order 1234567 has the capacity requirement on its work center Wxxxxx. It means it has the requirement on pooled capacity Pxxxxx.  If more than one work center shared this pooled capacity, the requirement (transaction CM01) will be shown on all the work center with the SAME shared pooled capacity.

SAP PP Reference Books:
SAP Production Planning , Configuration, Interview Questions and Certification, Books

Goto:
SAP MRP - Materials Requirements Planning Configuration Hints and Tips 

Back to:
SAP PP (Production Planning) Configuration Hints and Tips

Return to :-
SAP ABAP/4 Programming, Basis Administration, Configuration Hints and Tips

(c) www.gotothings.com All material on this site is Copyright.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
All product names are trademarks of their respective companies.  The site www.gotothings.com is in no way affiliated with SAP AG.
Any unauthorised copying or mirroring is prohibited.