Production Operations Overlapping

Operations -                     Start                   Finish

Normal Operations  1  -    01.01.XXXX       02.01.XXXX
                               2  -    02.01.XXXX       03.01.XXXX

Continuous Flow      1 -    01.01.XXXX       02.01.XXXX
                                2 -     01.01.XXXX       02.01.XXXX

Continuous Flow Configuration in  Routing - CA02

  • Double click on the Work Center
  • Scroll down and look for the Overlapping section
  • Click Continuous flow prod. - input a Min send-ahead quantity if you want.

SAP PP Reference Books:
SAP Production Planning , Configuration, Interview Questions and Certification, Books

Goto:
SAP MRP - Materials Requirements Planning Configuration Hints and Tips 

Back to:
SAP PP (Production Planning) Configuration Hints and Tips

Return to :-
SAP ABAP/4 Programming, Basis Administration, Configuration Hints and Tips

(c) www.gotothings.com All material on this site is Copyright.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
All product names are trademarks of their respective companies.  The site www.gotothings.com is in no way affiliated with SAP AG.
Any unauthorised copying or mirroring is prohibited.