Planned Independant Requirement included/excluded in MRP run

MD62 - Look for the indicator version

Tick    to include in MRP run
Untick to exclude in MRP run

OMPG - Define consumption mode and period of adjustment.
MM02 - The field in Material Master (MRP Group) determine whether the configuration is check during MRP run.

For example, if you configure consume forward as 2 days.  During MRP run, forcast (VSF) must be at least 2 days ahead of the last firm Sales Order or it would be consume into the Sales Order.

SAP PP Reference Books:
SAP Production Planning , Configuration, Interview Questions and Certification, Books

Goto:
SAP MRP - Materials Requirements Planning Configuration Hints and Tips 

Back to:
SAP PP (Production Planning) Configuration Hints and Tips

Return to :-
SAP ABAP/4 Programming, Basis Administration, Configuration Hints and Tips

(c) www.gotothings.com All material on this site is Copyright.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
All product names are trademarks of their respective companies.  The site www.gotothings.com is in no way affiliated with SAP AG.
Any unauthorised copying or mirroring is prohibited.