Planned Independant Requirement
included/excluded in MRP run
MD62 - Look for the indicator version
Tick to include in MRP run
Untick to exclude in MRP run
OMPG - Define consumption mode and period of adjustment.
MM02 - The field in Material Master (MRP Group) determine
whether the configuration is check during MRP run.
For example, if you configure consume forward as 2 days.
During MRP run, forcast (VSF) must be at least 2 days ahead of the last
firm Sales Order or it would be consume into the Sales Order.
SAP PP Reference Books:
SAP
Production Planning , Configuration, Interview Questions and Certification,
Books
Goto:
SAP MRP - Materials
Requirements Planning Configuration Hints and Tips
Back to:
SAP PP (Production
Planning) Configuration Hints and Tips
Return to :-
SAP ABAP/4 Programming,
Basis Administration, Configuration Hints and Tips
(c) www.gotothings.com All material on this site is Copyright.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
All product names are trademarks of their respective
companies. The site www.gotothings.com is in no way affiliated with
SAP AG.
Any unauthorised copying or mirroring is prohibited.
|