What the configuration to be
done for route determination?
You can do the following steps to
configure route determination:
Step: 1
Define Modes of Transport
Path: SPRO - Logistics Execution
- Transportation - Basic Transportation Function - Routes - Define Routes
- Define Modes of Transport.
Step: 2
Define
Shipping Types
Path: SPRO - Logistics Execution
- Transportation - Basic Transportation Function - Routes - Define Routes
- Define Shipping Types
There select New Entries and Assign
the Shipping Type (e.g. Road or Train) and Assign Mode of Transport (Mdtr)
and Assign Shipping type Procedure group.
Step: 3
Define Transportation Connection
Point
Path: SPRO - Logistics Execution
- Transportation - Basic Transportation Function - Routes - Define Routes
- Define Transportation Connection Point.
Step: 4
Define Routes and Stages
Path: SPRO - Logistics Execution
- Transportation - Basic Transportation Function - Routes - Define Routes
- Define Routes and Stages.
Select the New Entries and Enter
the Details
Then Select the Routes stages and
define
Step: 5
Maintain Stages for all Routes.
Path: SPRO - Logistics Execution
- Transportation - Basic Transportation Function - Routes - Define Routes
- Maintain Stages for all Routes.
Step: 6
Define Transportation Zone
Path: SPRO - Logistics Execution
- Transportation - Basic Transportation Function - Routes - Route Determination
- Define Transportation Zone.
Step: 7
Maintain County and Transportation
Zone for Shipping Point
Path: SPRO - Logistics Execution
- Transportation - Basic Transportation Function - Routes - Route Determination
- Maintain County and Transportation Zone for Shipping Point.
Select the Shipping point and enter
the Country and Transportation Zone
Step: 8
Define Transportation Groups.
Path: SPRO - Logistics Execution
- Transportation - Basic Transportation Function - Routes - Route Determination
- Define Transportation Groups
Step: 9
Maintain Route Determination
Path: SPRO - Logistics Execution
- Transportation - Basic Transportation Function - Routes - Route Determination
- Maintain Route Determination.
Go to Customer master data.
In Address of General data. Enter
the Transportation Zone id. and save
RESULT
The above mention configuration
will assist in Route Determination.
Route is determined automatically
in the sales order based on:
1. Departure zone or country of
the Delivering Plant
2. Destination zone or country
of the Ship-to Party
3. Shipping condition from the
Sold-to Party Customer master
4. Transportation group from Material
Master |