1) For Planning Material Requirements with Requirements
Grouping. The following options are available:
A. Automatic Requirements Grouping Within a Project
2) The following evaluations are available for analyzing the planning result: A. MRP list
3) The MRP procedures supported in consumption-based planning are: A. Reorder Point Planning
4) The master data for MRP, which can be maintained over the MRP menu, includes: A. planning calendar
5) Distribution resource planning provides a framework for determining the need to replenish inventory by: A. Linking market requirements with manufacturing and
demand management
6) In order to perform a DRP run, you must: A. Set up a distribution network, including identification
of quota arrangements and lead times.
7) The deployment results, displayed after the deployment run, indicate: A. Quantities to be deployed to each DC from the specified
supplying plant
8) You specify a fair share rule in the MRP 4 view of the material master record to identify how you want fair share to be implemented: A. Fair share rule A distributes the stock proportionally
to all DCs according to demand.
9) If you have assigned an MRP profile and/or forecast profile to a material, it may later be necessary to: A. Delete the assignment of the profile to the material
if you want to overwrite the fixed values defined in the profile
10) There are two types of availability check: A. Availability check for the various stock types in Inventory
Management
--- Correct Answers 1) A, B, C, D 2) A, B, C, D 3) A, B, C 4) A, B, C 5) A, B, C 6) A, B 7) A, B, C 8) A, B 9) A, B 10) A, B |
|