Material Requirement Planning Multipe Choice Questions And Answers #2

1) The MRP procedures supported in consumption-based planning are:

A. Reorder Point Planning
B. Forecast-Based Planning
C. Time-phased planning
 

2) Master data, which can only be maintained in Customizing for MRP, includes:

A. MRP controller key
B. special procurement type
C. lot-sizing procedure
D. MRP type
E. MRP area
 

3) Special planning processes include:

A. subcontracting
B. direct production
C. direct procurement
D. storage location MRP
E. planning with MRP areas
F. multi-plant/site planning
G. requirements grouping for individual project planning
 

4) Planning Material Requirements with Requirements Grouping, The following options are available:

A. Automatic Requirements Grouping Within a Project
B. Multi-Plant Requirements Grouping with a Grouping WBS Element
C. Multi-Plant Requirements Grouping with Several Grouping WBS Elements
D. Requirements Grouping with a Grouping WBS Element for Each Plant
E. Requirements Grouping with Several Grouping WBS Elements for Each Plant
F. Requirements Grouping with Hierarchically Structured Grouping WBS Elements
 

5) You can use this user exit, which is predefined by SAP, to restrict the total planning run to certain materials that fulfill freely definable criteria. For Followings, you can thus determine that:

A. only materials planned using MRP or
B. only materials for a particular MRP controller or
C. only materials procured externally or in-house
 

6) The following evaluations are available for analyzing the planning result:

A. MRP list
B. stock/requirements list
C. planning result
D. planning situation
E. planning table for repetitive manufacturing
 

7) There are three types of availability check:

A. Check on the basis of the ATP quantities
B. Check against product allocation
C. Check against planning
 

8) Creating PIRs for the MRP Area, You can use followings:

A. Define MRP area in Customizing for material planning
B. Assign the material to appropriate MRP area in the material master
C. Maintain parameters in the material master; these parameters apply both to the MRP area and to the entire plant
 

9) You must check the following scheduling parameters in Customizing for MRP or for Repetitive Manufacturing under Define Scheduling Parameters for Planned Orders.

A. You must define detailed scheduling or rate-based scheduling for planned orders with the order type LA.
B. You must define rate-based scheduling, detailed scheduling or sequencing for run schedule quantities
C. You must define detailed scheduling for production orders, otherwise the system does not display the capacity data correctly.
 

10) In Customizing for the planning table, under Maintain Entry Parameters, you can definecertain settings for the initial screen. These include, Followings:

A. The period of examination that is calculated from the current date - if you have entered the selection period.
B. Whether the planning table is to be selected for a particular material, product group, class, MRP controller, production line or production line group.
C. Which scheduling strategy is to be used.

---

Correct Answers

1) A, B, C

2) A, B, C, D

3) A, B, C, D, F, G

4) A, D, F

5) A, B, C

6) A, B, C, D

7) A, B, C

8) A, B, C

9) A, B, C

10) A, B, C

SAP MRP

Read Also:
Materials Requirement Planning Self-Test Knowledge

SAP PP Reference Books:
SAP Production Planning , Configuration, Interview Questions and Certification, Books

Goto:
SAP MRP - Materials Requirements Planning Configuration Hints and Tips 

Back to:
SAP PP (Production Planning) Configuration Hints and Tips

Return to :-
SAP ABAP/4 Programming, Basis Administration, Configuration Hints and Tips

(c) www.gotothings.com All material on this site is Copyright.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
All product names are trademarks of their respective companies.  The site www.gotothings.com is in no way affiliated with SAP AG.
Any unauthorised copying or mirroring is prohibited.