Material Requirement Planning Multiple Choice Questions and Answers #2 |
Questions1) The MRP procedures supported in consumption-based planning are:A. Reorder Point PlanningB. Forecast-Based Planning C. Time-phased Planning 2) Master data, which can only be maintained in Customizing for MRP, includes:A. MRP Controller KeyB. Special Procurement Type C. Lot-Sizing Procedure D. MRP Type E. MRP Area 3) Special planning processes include:A. SubcontractingB. Direct Production C. Direct Procurement D. Storage Location MRP E. Planning with MRP Areas F. Multi-Plant/Site Planning G. Requirements Grouping for Individual Project Planning 4) Planning Material Requirements with Requirements Grouping, the following options are available:A. Automatic Requirements Grouping Within a ProjectB. Multi-Plant Requirements Grouping with a Grouping WBS Element C. Multi-Plant Requirements Grouping with Several Grouping WBS Elements D. Requirements Grouping with a Grouping WBS Element for Each Plant E. Requirements Grouping with Several Grouping WBS Elements for Each Plant F. Requirements Grouping with Hierarchically Structured Grouping WBS Elements 5) You can use this user exit, which is predefined by SAP, to restrict the total planning run to certain materials that fulfill freely definable criteria. For the following, you can thus determine that:A. Only materials planned using MRPB. Only materials for a particular MRP Controller C. Only materials procured externally or in-house 6) The following evaluations are available for analyzing the planning result:A. MRP ListB. Stock/Requirements List C. Planning Result D. Planning Situation E. Planning Table for Repetitive Manufacturing 7) There are three types of availability check:A. Check on the Basis of the ATP QuantitiesB. Check Against Product Allocation C. Check Against Planning 8) Creating PIRs for the MRP Area, you can use the following:A. Define MRP Area in Customizing for Material PlanningB. Assign the Material to the Appropriate MRP Area in the Material Master C. Maintain Parameters in the Material Master; These Parameters Apply Both to the MRP Area and to the Entire Plant 9) You must check the following scheduling parameters in Customizing for MRP or for Repetitive Manufacturing under "Define Scheduling Parameters for Planned Orders":A. You Must Define Detailed Scheduling or Rate-Based Scheduling for Planned Orders with the Order Type LA.B. You Must Define Rate-Based Scheduling, Detailed Scheduling, or Sequencing for Run Schedule Quantities. C. You Must Define Detailed Scheduling for Production Orders; Otherwise, the System Does Not Display the Capacity Data Correctly. 10) In Customizing for the Planning Table, under "Maintain Entry Parameters," you can define certain settings for the initial screen. These include:A. The Period of Examination That Is Calculated from the Current Date - If You Have Entered the Selection Period.B. Whether the Planning Table Is to Be Selected for a Particular Material, Product Group, Class, MRP Controller, Production Line, or Production Line Group. C. Which Scheduling Strategy Is to Be Used. Correct Answers1) A, B, C2) A, B, C, D 3) A, B, C, D, F, G 4) A, D, F 5) A, B, C 6) A, B, C, D 7) A, B, C 8) A, B, C 9) A, B, C 10) A, B, C |
![]()
|
Read Also:
SAP PP Reference Books:
Goto:
Back to:
Return to :-
(c) www.gotothings.com All material on this site is Copyright.
|