AS-IS AT XYZPLT

  • Labor and Machines are work centers. 
  • Capacity utilization of all machines is 100%.
  • In all Plant shift is for 8.00 Hrs.
TO-BE / SAP-PROCESS AT XYZPLT
  • Accordingly Capacity Category (labor or machine) will be used. 
  • Capacity Utilization of each work center will be used as 100%.
  • Shift Timings of Work centers to be fixed according to plants (All shifts will be maintained for each work center).
  • The creation, Change and Display of Work Centers will be done plant wise.
GENERAL EXPLANATION
  • All machines and labors will be created in SAP as work centers masters.
  • These masters will have the capacity availability details in terms of number of shifts, shift sequences, work breaks, and the cost center data.
  • Following types of Work Centers would be created:
1. Lathe Machines 6. Vertical Slotting Machine
2. Drilling Machines 7. Milling Machines
3. Shaping Machines  8. Hack Saw Machine
4. Boring Machines 9. Welding Machine
5. Bending Machines 10. Plasma Cutting Machine

DATA IN WORK CENTER WILL BE USE FOR

  • Scheduling: - Operation times and formulas entered in the work center, so that the duration of an operation can be calculated.
  • Costing: - Required costing formulas are entered in the work center, so that the costs of an operation can be calculated. A work center is also assigned to a cost center.
THE WORK CENTER WOULD SERVE THE FOLLOWING PURPOSES VIZ.
  • To determine which machine or manpower is to be used in an operation.
  • To calculate costs and dates for an operation.
  • Work center can contain multiple types of capacity categories like Machine, Setup and Labor.
  • Standard value key defined in the work centers will identify the parameters to be captured. The typical standard values are setup time, machine time, labor time etc. This can be maintained in Minutes etc.
  • Work centers will be assigned to a cost center and there will be activity types defined in these cost centers. Activity types are evaluated for each cost center and period with a charge rate that consists of a fixed portion and a variable (work-related) portion. These activity types determine the charge rate with which costing is to be carried out for internal standard values viz., machine hours, setup time and labour hours defined in the controlling module.
  • The available capacity will be taken from the work centre in which is maintained shift schedule and shift sequence.
WORK CENTER CODIFICATION 

UNIT I
 
NO. MACHINE NAME (MACHINE SHOP) CODE NO. MACHINE NAME (FABRICATION  SHOP) CODE
1. Horizontal Boring Machine, H160 1HBMH160 1. Welding Machine, TIG 01 1WMTIG01
2. Plaino Miller Machine, Heller 1PMHELLR 2. Welding Machine, TIG 02 1WMTIG02
3. Horizontal Boring Machine, Skoda 1HBSKODA 3. Welding Machine, CO2 01 1WMCO201
4. Horizontal Boring Machine, H80 1HBMCH80 4. Welding Machine, CO2 02 1WMCO202
5. Vertical Turret Lathe,VTL  1VTLATHE  5. Plate Bending, Upto 15mm 1PBEND15
6. Radial Drilling Machine,RDM5 1RDMRDM5 6. Shearing Machine,upto5mm 1SHEARM5
7. Radial Drilling Machine, Universal 1RDMUNIV 7. Hand Gas Cutting Machine,1 1HGCUT01
8. Radial Drilling Machine,  1RDRILLM 8. Hand Gas Cutting Machine,2 1HGCUT02
9. Lathe Machine,CL-6QMT  1LM06QMT 9. Hand Gas Cutting Machine,3 1HGCUT03
10. Lathe Machine,CL-7QMT 1LM07QMT 10. Hand Gas Cutting Machine,4 1HGCUT04

UNIT II
 
NO.  MACHINE NAME (MACHINE SHOP)  CODE NO. MACHINE NAME (FABRICATION SHOP) CODE
1. Radial Drill Machine,Imported01 2RDRIL01 1. Welding Transformers, 1 to 33 2WTRAN01 to 2WTRAN33
2. Radial Drill Machine,Imported02 2RDRIL02 2. Welding Rectifier,01 2WRECT01
3. Stand Drill,01  2SDRIL01 3. Welding Rectifier,02 2WRECT02
4. Magnet Drill,01 2MDRIL01 4. Pug Machines, 1 to 11  2PUGMC01 to 2PUGMC11
5. Magnet Drill,02 2MDRIL02 5. Hand Grinder (7”), 1 to 14 2HGRI701 to 2HGRI714
6. Magnet Drill,03 2MDRIL03 6. Hand Grinder (4”), 1 to 4 2HGRI401 to 2HGRI404
7. Hand Drill,01 2HDRIL01 7. Table Grinder 2TBGRI01
8. Hand Drill,02 2HDRIL02 8. Shaft Grinder 2SHGRI01
9. Hydraulic Hack Saw 2HYHSW01 9. Straight Grinder 2STGRI01
10. Hyd. Pipe Bender 2HYPBD01 10. Electrodes Drying Oven 2OVEN002
                                                
UNIT III

DIVISION I
 
NO. MACHINE NAME (MACHINE) CODE NO. MACHINE NAME (FABRICATION) CODE
1. Lathe Machine,01 3LATHM01 1. Welding Machines, 1 to 26 3WELDM01 to 3WELDM26
2. Lathe Machine,02 3LATHM02 2. Pug Machines, 1 to 14 3PUGMC01 to 3PUGMC14
3. Lathe Machine,03 3LATHM03 3. Profile Cutting Machine 3PROFCM1
4. Lathe Machine,04 3LATHM04 4. Grinders, 1 to 20 3GRIND01 to 3GRIND20
5. Lathe Machine,05 3LATHM05 5.  Plate Bending & Rolling Machine, 32 mm 3PBEND32
6. Lathe Machine,06 3LATHM06 6. Plate Bending & Rolling Machine, 80 mm 3PBEND80
7. Lathe Machine,07 3LATHM07 7.
8. Shaping Machine,01 3SHAPRE1 8.
9. Shaping Machine,02 3SHAPRE2 9.
10. Radial Drilling Machine,01 3RDRIL01 10.
                                                                                                                                   
DIVISION II
 
NO. MACHINE NAME (MACHINE)  CODE
1. Radial Drilling Machine ( COLB)  3RDRIL04
2. Radial Drilling Machine   (To Be Install) 3RDRIL05
3. Boring Machine  ( BFT 180) 3BMFT180
4. Boring Machine ( FB180 To Be Install) 3BMFB180
5. Boring Machine (BFT110 To BE Install) 3BMFT110
6. Vertical Turret Lathe ( To Be Install) 3VTLATHM
7. Milling Machine  (Make BHOLE) 3MMBHOLE
8. CNC Gas Cutting Machine ( To Be Install) 3CNCGMC
                                        
REPORTING CONSIDERATIONS

  • CR08 – Work Center Hierarchy Report
  • CR06 – Work Center Assignment to Cost Centers
  • CR07 – Work Center Capacities
  • CR60 – Work Center information system
LIST OF BUSINESS PROCESS PROCEDURES (BPP)
  • CR01 – Creation of Work Center
  • CR02 – Change of Work Center
  • CR03 – Display of Work Center
  • CR21 – Create Work Center Hierarchy
  • CR22 – Change Work Center Hierarchy
  • CR23 – Display Work Center Hierarchy
  • CA85 – Replace
  • CA80 – Work Center Where used list

SAP MRP

Read Also:
Work Center Creation and Change

SAP PP Reference Books:
SAP Production Planning , Configuration, Interview Questions and Certification, Books

Goto:
SAP MRP - Materials Requirements Planning Configuration Hints and Tips 

Back to:
SAP PP (Production Planning) Configuration Hints and Tips

Return to :-
SAP ABAP/4 Programming, Basis Administration, Configuration Hints and Tips

(c) www.gotothings.com All material on this site is Copyright.
Every effort is made to ensure the content integrity.  Information used on this site is at your own risk.
All product names are trademarks of their respective companies.  The site www.gotothings.com is in no way affiliated with SAP AG.
Any unauthorised copying or mirroring is prohibited.